Announcement: $30 Billion Investment in Mahshahr Petrochemical Zone by the Persian Gulf Petrochemical Brokers Group

Consultation, Inquiry, Order Placement

555 4236 021 number-call

Sepandar Petrochemical Industries

صنـا یع پتـر و شیمـی سپنتـا

Oil Industry, Production Leap, Technological Optimization

Top Rank

Highest Market Value

Top Rank

Highest Exports

Import and Export

Lorem Ipsum is a dummy text used in the printing industry, created with the aim of producing nonsensical simplicity, and utilized by graphic designers.

Commodity Exchange

Lorem Ipsum is a dummy text used in the printing industry, created with the aim of producing nonsensical simplicity, and utilized by graphic designers.

International Transportation

Lorem Ipsum is a dummy text used in the printing industry, created with the aim of producing nonsensical simplicity, and utilized by graphic designers.

Metals and Minerals

Lorem Ipsum is a dummy text used in the printing industry, created with the aim of producing nonsensical simplicity, and utilized by graphic designers.

Specialized Services

Lorem Ipsum is a dummy text used in the printing industry, created with the aim of producing nonsensical simplicity, and utilized by graphic designers.


Warning: Undefined array key "main_slider" in /home/geociv/public_html/wp-content/themes/Sepandar/sepanta-elements/widgets/sp-projects.php on line 491

We show you the path to success

Projects

Progress rate

٪71

Iranol Efficiency Improvement Plan

Duration: 150 days

Project Type: Developmental

Execution Method: EPC

This plan has been developed with the aim of enhancing productivity and reducing operational costs at the Iranol petrochemical complex. Production efficiency will be improved through the optimization of chemical processes and the upgrading of key equipment. The installation of new catalysts in the main reactors will lead to an increased conversion rate of raw […]

View Project

Progress rate

٪100

Northern Petrochemical Project Plan

Duration: 280 days

Project Type: Developmental

Execution Method: EPD

This project is designed to increase production capacity and improve the quality of petrochemical products in the northern region of the country. Given the strategic location of the complex—close to gas resources and with access to open waters—comprehensive planning has been undertaken for the development of new units. Main Components of the Plan:Construction of an […]

View Project

Progress rate

٪78

Improvement Plan for IRALCO Efficiency

Duration: 360 days

Project Type: Constructive

Execution Method: EPS

This plan has been designed with the aim of enhancing efficiency and reducing operational costs at the Iranol Petrochemical Complex. Production efficiency will be improved through optimization of chemical processes and upgrading of key equipment. The installation of new catalysts in main reactors will result in a higher conversion rate of raw materials into valuable […]

View Project

Progress rate

٪25

Northern Power Plant Optimization Plan

Duration: 180 days

Project Type: Developmental

Execution Method: EPC

The optimization of the Northern Power Plant encompasses a series of strategic measures aimed at enhancing the performance and efficiency of the facility. Phase One: Thermal Efficiency and Fuel Optimization The first step involves improving fuel consumption and increasing the plant’s thermal efficiency through the installation of advanced heat recovery systems. These systems reclaim lost […]

View Project

Progress rate

٪68

Iranol Quality Improvement Plan

Duration: 280 days

Project Type: Developmental

Execution Method: EPC

This plan has been designed to enhance efficiency and reduce operational costs at the Iranol Petrochemical Complex. Production efficiency is improved through optimization of chemical processes and upgrading of key equipment. Installing new catalysts in the main reactors leads to an increased conversion rate of raw materials into high-value products. Reconstruction of heat exchangers and […]

View Project

Progress rate

٪48

Northern Project Improvement Plan

Duration: 260 days

Project Type: Constructive

Execution Method: EPC

This project has been designed with the goal of increasing production capacity and improving the quality of petrochemical products in the northern region of the country. Considering the strategic location of this complex near gas resources and access to open waters, a comprehensive plan for developing new units has been prepared. Main Axes of the […]

View Project

Get to Know Us Better

درباره سپنتـا

درباره سپنتـا

No video selected for display.

+60 Projects

Successful and Completed

+60 Projects

موفق و به اتمام رسیده

+60 Projects

موفق و به اتمام رسیده

Stay informed about our daily news.

Related News


Warning: Undefined array key "main_slider" in /home/geociv/public_html/wp-content/themes/Sepandar/sepanta-elements/widgets/sp-recent-posts.php on line 269
Related News

Warning: Undefined array key "main_slider" in /home/geociv/public_html/wp-content/themes/Sepandar/sepanta-elements/widgets/sp-team.php on line 320

We’ll be with you every step of the way

Sales Specialists

رسول مومنی

Jerome Powell

Commercial Manager

رسول مومنی

Jerome Powell

Commercial Manager

Keep up with the latest news

Blogs

see all